by Leith Stetson | Nov 16, 2023 | Recent Installations
After installing two units in McGonigle Hall during renovations in 2015, one in the basketball practice facility and the other in the main athletic training facility, Temple University added two small plunge tanks to the basketball game day facility in Liacouras...
by Leith Stetson | Nov 16, 2023 | Recent Installations
When the cold plunge in the shared track and field/wrestling locker room failed, Tim Weesner, Assoc. Director of Athletic Training started searching for a replacement system. This proved challenging because of the narrow doorways and tight hallway turns into the...
by Leith Stetson | Nov 16, 2023 | Case Studies, Video
Brett Favre’s Oak Grove High School Experience Often coupled with tragedy is tremendous opportunity. This proved to be the case at Oak Grove High School in Hattiesburg, MS. A 2013 tornado destroyed the school’s entire athletic facility. In this video, Brett...
by Leith Stetson | Nov 16, 2023 | Recent Installations
This installation is a great example of what can be done with an old shower room. Three large Rubbermaid tubs and an ice machine were moved out, and Model 4196 was moved in. The space is now more functional and attractive, meeting the recovery and treatment needs of...